1.3 Stability with time or drift
This test shall be conducted for a period of seven days following the warm-up time. The measurements shall be performed at least every 24 hours under reference conditions using a CGM with the largest and the smallest volume fractions for the components to be determined according to 1.2. During the tests the requirements of R 144-1, 4.8 shall be met.