8.6 Other important technical requirements

The gas analytical system shall be tested for conformity to the following requirements:

  1. warm-up time: …​…​…​…​…​…​…​…​…​…​…​…​…​…​.. according to 4.7 and R 144-2, 1.16;

  2. response time: …​…​…​…​…​…​…​…​…​…​…​…​…​…​. according to 4.6 and R 144-2, 1.17;

  3. change in the gas flow rate (in a gas handling system): .. according to 5.1.5, 5.5.2 and R 144-2, 1.18;

  4. leakproofness of the gas handling system: …​…​…​…​…​. according to 5.1.6, 5.5.2 and R 144-2, 1.19.