4.7 Warm-up time
After switching on the gas analytical system and after the warm-up time specified by the manufacturer of this system, it shall meet the metrological requirements stated in this Recommendation.
After switching on the gas analytical system and after the warm-up time specified by the manufacturer of this system, it shall meet the metrological requirements stated in this Recommendation.