A.4 Inspection of packaging material
A procedure should be established for inspecting, accepting and rejecting packing materials. These checks should include assessing conformance to the marking requirements in OIML R 79:2015.
A procedure should be established for inspecting, accepting and rejecting packing materials. These checks should include assessing conformance to the marking requirements in OIML R 79:2015.