3.4.1.2 Application for certification
An application for the certification of a production system should be lodged for each production site with a designated body (Annex C provides guidance on the appointment of designated bodies). The packer should provide information regarding his production system including information regarding type of product, pack sizes, and related quantity control system and other information as required by the designated body. Annex A provides detailed guidance on the minimum production system information.