5.6 Preliminary runs
A sufficient number of preliminary runs shall be carried out before the actual verification/calibration runs in order to ensure complete elimination of any gases, which may be contained in the prover and associated piping, and to ensure that the liquid temperature is stable and uniform. The measuring system shall be checked to ensure that leaks do not exist.